Desktop Banner
Mobile Banner

Attention Please!
Construction Updates

OVERVIEW

INVEST IN YOURSELF, GET MORE TIME TO BE THE BEST YOU

Today’s fast-paced life restricts you from going the extra mile to explore your passion & keeps you in a monotonous loop of work & stress. But, at La Centra you can easily take out about 4-5 hours* for yourself without affecting your work-life balance.

Yes, nestled in the heart of West Pune’s most desired locality – Wakad Next, Tathawade, La Centra keeps you close to various essentials, a variety of prime avenues & a plethora of conveniences that reduces your commute time to minimum & offers more time to invest in yourself.

La Centra is specifically designed to cater to an ultra-modern lifestyle & the modern needs of new-age homebuyers. Explore smart homes where your voice takes the lead, enjoy a holistic lifestyle with exclusive rooftop experiences and experience life at the heart of every convenience.

ENJOY THE BEST OF MODERN CENTRAL LIVING WITH:
16-floor mixed-use development
Spacious apartments with home automation
Premium interiors with international fittings
20+ exclusive rooftop indulgences
West Pune’s fastest-developing location
Strategic location, off Pune-Mumbai Highway
2 mins from Bhumkar Chowk & 5 mins from Hinjewadi
Actual Image

ARTICLES

CURATED RESEARCH

Buying a home is the most important decision in one’s life, emotionally & financially.
Choose wisely, choose right. Make an informed choice for you & your future self.

Invest in the West Pune’s Fastest
Developing Location - Wakad-Next
Read more
An offer to help you make the big
jump - 50% EMI for 18 months!
Read more
Why does buying a home in a new
launch project make more sense?
Read more
Bigger is not better - Pay only for
the space you use

Read more

LOCATION

LIVE AT THE HEART OF FASTEST DEVELOPMENT

Discover life in Wakad Next - a location that’s fast-developing, well-connected yet peaceful, where the everyday humdrum gives way to enjoyable experiences, where every necessity of life is just a few minutes away. Welcome to Tathawade – Pune’s next premium destination - the rise of a modern urban haven.
Minutes away from all major hotspots in West Pune & PCMC, La Centra changes the game with its all-accessible & well-connected location. Cut down on precious commute time and focus more on work and home. From daily essentials, shopping centers to malls & multiplexes, the location has it all.

location images
Artistic Impression
ENJOY EXPRESS CONNECTIVITY
LOCATED RIGHT OFF THE HIGHWAY
  • Pune-Mumbai Expressway - 0 min
  • Bhumkar Chowk - 2 mins
  • Hinjewadi – 5 mins
  • Balewadi High Street – 10 mins
location images
Artistic Impression
Commute Less, Live More
Near all major IT Hubs
  • Hinjewadi IT Park
  • Panchshil IT Park
  • World Trade Center
  • PCMC industrial area
location images
Artistic Impression
Enjoy a Happening Social Life 5 mins from Phoenix Marketcity AND other malls
  • Phoenix Marketcity
  • Vision One Mall
  • David Lloyd Club
  • Xion Mall
  • D-Mart
  • Balewadi High St.
  • Decathlon
  • The Social Street Hinjewadi
location images
Artistic Impression
Education Hub, Medical Haven Close to Reputed Schools & Colleges
  • Akshara International school
  • Euro Kids School
  • JSPM
  • Indira College
  • DY Patil Institute of Hotel Management
location images
Artistic Impression
Renowned Hospital
Nearby
  • Golden Care
  • LifePoint
  • MediPlus Specialty
  • Surya Mother and Child
  • Aditya Birla Memorial
  • Ruby Hall Hinjewadi
  • Jupiter Hospital
LAYOUT MAP GOOGLE MAP
SCHEDULE A SITE VISIT

INVEST IN AN EXCLUSIVE LIFESTYLE

UPCOMING DEVELOPMENTS

WAKAD NEXT:
WEST PUNE’S NEXT HOTSPOT

Emerging as a prime location in West Pune, Tathawade is the fastest-developing location that is well on the way to becoming a popular residential hub with rapid infrastructure expansion, dense residential developments and numerous upcoming conveniences. Set to become the next Wakad, a dream destination to enjoy the best of connectivity & uncluttered living, Tathawade is Pune’s new epicenter of real estate growth. Read More

Phoenix Marketcity
World Trade Center
DMart
Metro Connectivity
Hilton Hotel
Panchshil IT Park
City Pride CBSE School
Indialand Global High Street & Shopping Mall
PCMC Garden

HOMES

PREMIUM HOMES CURATED FOR A CONVENIENT LIFE

Revel in the convenience of smart & spacious homes at La Centra. From marvelous interiors to intricate detailing, feel at home, the moment you step in. Right from layout planning to premium fittings, the offerings here are all set to uplift your lifestyle to another level. Take a step up & explore the feeling of living it up in your future home, designed for the modern generation.

Artistic Impression
Spacious zero-wastage layouts & maximum space utilization
Artistic Impression
Smart home control with simple
voice commands
Artistic Impression
Unobstructed green views from
balconies & windows
Artistic Impression
Ample natural sunlight, wind-flow
& ventilation

ARCHITECTURE

INNOVATIVE ARCHITECTURE FOR
STRESS-FREE LIVING

La Centra has been designed with a unique architecture that emphasizes the verticality of design. Every square inch of space has been thoughtfully laid out, designed with perfection & optimal efficiency. This user-centric design delivers on all counts with the optimal utilization of space without falling short on functionality.

Every element, even as small as plumbing ducts, has been designed aesthetically
A planted oasis structure with a glass house in the middle for an eco-friendly environment
Larger height of the shopping complex creates the perception of spaciousness
Quality of materials delivers long-term performance and contributes to the overall design
Residence facades are designed to maximize glazing for daylight and views
Full height opening has been designed for lavish vistas
Artistic Impression

AMENITIES

INVEST IN YOURSELF WITH 20+ ROOFTOP INDULGENCES

With 20+ amenities, La Centra offers you a variety of exclusive experiences to keep up with your passion & invest in yourself, right from fitness to entertainment. Thoughtfully planned to cater to the needs of all age groups, our amenities are exclusively designed for a fun & healthy lifestyle. To double the fun, all the premium amenities are located on the rooftop.


Enjoy a host of exclusive indulgences at the terrace while soaking in the breathtaking view that the city has to offer.

Artistic Impression
Artistic Impression
Artistic Impression
Artistic Impression
FITNESS
  • Yoga/Aerobics/Meditation area
  • Gym with modern equipment & steam sauna room
  • Indoor games
  • Jogging/walking track
  • Kids play area
RECREATION
  • Multipurpose hall
  • Party lounge area
  • Party lawn
  • Senior citizen seating area
  • Two Jacuzzis (His & Her)
  • Gazebo
  • Kids/Plunge pool
  • Designer lobby
Artistic Impression
Artistic Impression
Artistic Impression
Artistic Impression
Artistic Impression
Artistic Impression
Artistic Impression
ESSENTIALS
  • Internal paved and concrete roads
  • Generator backup for common area & passages
  • Underground and overhead tanks for water storage
  • Solar water heating system
  • CCTV cameras for common areas
  • Fire-fighting system
  • Premium quality elevators

COME WITNESS THE SAMPLE FLAT!

Humans of La Centra

SPECIFICATIONS

DISCOVER A SPARK OF ELEGANCE IN EVERY DETAIL

At La Centra, every home is curated using the finest-grade materials & fittings that promise a long-lasting performance, offering you a hassle-free lifestyle for years to come. From classic interiors to premium fittings, every detail of the homes has been curated with utmost care, to give you a feeling of living in your dream home at every step.

Artistic Impression
Spacious Master
Bedrooms
Artistic Impression
Well-planned Living
& Dining Areas
Artistic Impression
Modular Kitchen with
Dry Balcony
Artistic Impression
Premium Fittings of
Reputed Make
STRUCTURE
  • Earthquake Resistant Structure
WALLS
  • External & Internal walls in AAC Blocks
  • External Sand Faced Plaster
  • Internal walls Gypsum finish
  • All Ceiling in the Apartment in Gypsum finish
DOORS
  • Main Door with Laminate Both Side
  • Night latch for Main door
  • Internal doors with fixtures
  • Video Door Phone
WINDOWS
  • Powder coated Aluminum windows with Mosquito mesh
  • Powder coated Aluminum windows for kitchen
  • Powder coated Aluminum windows for attached terrace
  • All windows with Granite / Marble sills
  • M.S. Railing in terraces
  • MS safety grills for windows
FLOORING
  • 2 X 2 Vitrified tiles flooring for all rooms
  • Ceramic anti-skid tile flooring for terrace
  • Ceramic anti-skid tile flooring for toilet & Enclose Balcony
  • Dado tiles up to lintel level in toilets
KITCHEN
  • Black granite platform with Stainless Steel Sink
  • Dado Tiles in Kitchen
  • Provision for Exhaust Fan
  • Provision for water purifier
PAINTING
  • Internal: Oil bound Distemper
  • External: Acrylic Paint
ELECTRICALS
  • Concealed copper wiring
  • Modular Switches
  • Standard ISI multi strand wires with MCB
  • Provision for inverter backup
  • AC Points in Living and Master Bedroom
  • TV & Telephone Points in Living Room and Master Bedroom
  • Washing Machin point in Enclose balcony
  • Wi-Fi point in center of flat
TOILETS
  • Concealed plumbing.
  • Standard-make sanitary ware fittings
  • Wall-Hung Commode
  • CP fittings Jaquar or Equivalent
  • Toilet door with one side laminated with Granite frame
  • Hot & Cold-water Mixer
  • Provision for Geyser Points in Common Bathroom & Master Bathroom
  • Solar Water connection in Master bathroom
  • Provision for Exhaust Fan
ADDITIONAL FEATURES
  • 2-way switches in Master Bedroom (Fan and Light)
  • USB charging or Socket port in Master Bedroom (bed level port) and Living
  • Socket in terrace (for lighting purpose and charging point)
  • J hook for Main Door & terraces

EXPERIENCE WEST PUNE'S BIGGEST LAUNCH

FROM A TRUSTED REAL ESTATE BRAND

ABOUT US

Manav Group is well-diversified in the real estate sector & strives to bring intelligence with a touch of belongingness in its every creation. Our vision is to grow & ensure that our customers live happily ever after!
3500+
Happy Families
Served
20+
Years of Excellence
21+
Residential Projects Completed
6+
Infra
Projects
3.2+ M
sq.ft area developed
Artistic Impression